Examly題庫立即開始練習
共 8 類科共用卷
退除役轉任公務人員四等考試-一般行政類科退除役轉任公務人員四等考試-勞工行政類科退除役轉任公務人員四等考試-人事行政類科退除役轉任公務人員四等考試-會計類科鐵路人員高員三級-土木工程鐵路人員考試員級考試-建築工程鐵路人員高員三級-機械工程鐵路人員員級考試-機檢工程
法學知識與英文(包括中華民國憲法、法學緒論、英文)108 年第 47 題單選題考點:細節理解
📖 閱讀測驗 · 共用前文
China completed the construction of the Qinghai-Tibet Railroad in 2006. This 1,142-km railroad line runs across the snow-covered Plateau of Tibet, effectively linking the Tibetan capital, Lhasa, to the northwestern province of Qinghai. Also known as the Pan-Himalayan Railroad, this record-breaking railroad rises to 5,072 meters, earning the title as the world's highest passenger train with more than eighty percent of the track 13,000 feet or 3,962 meters above sea level. The Qinghai-Tibet Railroad is a great engineering achievement. Since it was built at high altitudes, both engineers and workers had to breathe bottled oxygen for fear of altitude sickness while working on the construction of the track. Additionally, there were many other challenges they had to cope with, including the soil that can rise and sink as the season changes. Some sections of track had to be laid on ground that is permanently frozen. Due to global warming, the rising temperatures may cause this permafrost to melt, making the land sink to a lower level. The track may become bent or curved as a consequence. Nevertheless, some smart countermeasures were taken so that the engineers managed to cool off the roadbed by keeping the permafrost stable. The cost savings to travelers resulting from the completion and operation of the Qinghai-Tibet Railroad are tremendous. Compared with typical fares for direct air travel, a typical train fare between Beijing and Lhasa is much cheaper. Moreover, travelers get to enjoy the magnificent sights and scenery along the way, making the long trip more than worthwhile. It is hoped that with better linkage to the world, the tourism industry will play an increasingly important role in Tibet's economy.

Which of the following statements about the Qinghai-Tibet Railroad is NOT true according to this passage?

AIt runs across high altitudes.
BIt connects Lhasa with Qinghai.
CIt causes the permafrost to melt.正確答案
DIt marks an amazing engineering victory.
答案與詳解
C
正確答案
反向題:找短文中「不正確」的敘述。青藏鐵路的永久凍土融化是「全球暖化」造成,並非鐵路本身導致。

逐選項解析

AIt runs across high altitudes.細節理解✕ 錯誤
短文第一段及第二段均指出鐵路建於高海拔,超過80%路段高於3,962公尺,故「runs across high altitudes」屬實,非本題答案。
BIt connects Lhasa with Qinghai.細節理解✕ 錯誤
短文第一段明確寫道 'effectively linking the Tibetan capital, Lhasa, to the northwestern province of Qinghai',連接拉薩與青海屬實,非本題答案。
CIt causes the permafrost to melt.✓ 正確
DIt marks an amazing engineering victory.✕ 錯誤

立即註冊,看完整詳解

這題的完整詳解,註冊就能看 · 每天 2 題免費

精選詳解
  • 完整逐選項解析
  • 秒殺解題技巧與破題關鍵
  • 關鍵知識表整理
  • 陷阱與易錯提醒
  • 同考點歷屆題庫連續刷題與錯題本

法學知識與英文(包括中華民國憲法、法學緒論、英文) 相關題目

想練更多法學知識與英文(包括中華民國憲法、法學緒論、英文)考古題?

Examly 收錄 50 萬+ 道歷屆題目,每題都有像這樣的精選詳解。免費下載,立即開練。

Examly